Demo

SITA Neerabup Biovision ARRT Facility

Services
Design, Specification, Testing, Fabrication - Compressed Air and Gases, Fire Protection and Water Services.

Materials
63mm HDPE for Air, 63mm HDPE for Water, 4” Rolled Groove Fire Mains feeding 4 double hydrants, 1” Galvanised Steel screwed for fire hoses through-out the facility.

Macmahon WAC Workshop, Perth Airport

Services
Specification Consultation, Testing during and post installation, fabrication of work stations, installation - Compressed Air and Water piping systems

Materials
HDPE

Stay in touch and get our latest product news and catalogues.





* REQUIRED